| Factory and
Boat-construction Video Tour |
|||||||
First-stage
Laminating Booth |
|||||||
| . |
In the second stage of construction, we hand-lay the
outer laminates and core into the mould on top of the new gel coat.
The outer laminate is usually a superfine layer of fibre-glass and then
the main layer of either Kevlar (HKCC & HKC boats) or carbon fibre
(HC).
|
||||||
| Next Step: Laminating
2 |
|||||||
|
Videos from the First-stage
Laminating Booth |
|||||||||
|
About |
|||||||||
| SYKES
RACING NORTH AMERICA + PMB 6685, 2711 CENTREVILLE RD, SUITE 120, WILMINGTON
DE 19808 + ph 480.234.4912 + email: tom@sykesna.com |
|||||||||