Factory and Boat-construction Video Tour
Assembly Floor
.
These stations are where the several pieces of the boat are put together. The boatbuilders first get the bulkheads and decks assembled before the boat gets the excess laminate removed in the dust-containment booth. Then the builders fit-out the fittings and finishing touches like striping.
 
Next Step: Metal Shop

 

Videos from the First-stage Laminating Booth
           
 
About
SYKES RACING NORTH AMERICA + PMB 6685, 2711 CENTREVILLE RD, SUITE 120, WILMINGTON DE 19808 + ph 480.234.4912 + email: tom@sykesna.com