| Factory and
Boat-construction Video Tour |
|||||||
Assembly
Floor |
|||||||
| . |
These stations are where the several pieces of the
boat are put together. The boatbuilders first get the bulkheads and
decks assembled before the boat gets the excess laminate removed in
the dust-containment
booth. Then the builders fit-out the fittings and finishing touches
like striping.
|
||||||
| Next Step: Metal
Shop |
|||||||
| Videos
from the First-stage Laminating Booth |
||||||||||
|
About |
||||||||||
| SYKES
RACING NORTH AMERICA + PMB 6685, 2711 CENTREVILLE RD, SUITE 120, WILMINGTON
DE 19808 + ph 480.234.4912 + email: tom@sykesna.com |
||||||||||