| Factory and
Boat-construction Video Tour |
|||||||
FIFO
(First In, First Out) |
|||||||
| . |
FIFO is basically a staging area prior to the assembly
of the boat. The hull (still in the mould) and the decks (out of their
moulds) are collected in the area, and when another spot in production
opens, the first boat to be fully laminated goes into assembly.
|
||||||
| Next Step: Assembly
Floor |
|||||||
|
(No Videos for FIFO) |
|||||||||
|
About |
|||||||||
| SYKES
RACING NORTH AMERICA + PMB 6685, 2711 CENTREVILLE RD, SUITE 120, WILMINGTON
DE 19808 + ph 480.234.4912 + email: tom@sykesna.com |
|||||||||